Facade renovation and insulation in Mallorca
We repair and insulate your building's facade, from the IEE (building inspection report) to the grant, with a quote you can take to the junta (owners' meeting).
- 4.8137 reviews on Google
- 100% recommendation on ProvenExpert (189 reviews)
- Office in Palma de Mallorca
Why Greenox
We get back to you within 24 working hours. No obligation, and you pay nothing before signing.
Dr. Lennart Jünemann · PhD in energy economics · your contact for all topics
Facades and insulation
Facade renovation in Mallorca for communities of owners
Facade renovation in Mallorca costs between €25 and €50/m² in 2026 if painting is enough, between €80 and €120/m² with external wall insulation (SATE) and between €150 and €300/m² if the structure needs repairing, according to prices published in Palma. For 500 m² of facade with SATE, that is €40,000 to €60,000, shared among the owners.
We work for the president of the comunidad de propietarios (community of owners) and the administrador de fincas (property manager): we inspect the facade, prepare an itemised quote the junta can compare, and take care of the licence, the scaffolding, the work and the grants. If you own a house, we also do facades of houses and villas.
- Repairs to cracks, cornices, balconies and slab edges
- External wall insulation (SATE) or a ventilated facade
- Damp treatment before painting or insulating
- Windows and frames that keep the heat out
- Roof and roof terrace in the same project
- Work after an unfavourable IEE, final report for the Ajuntament (council)
- Energy certificate for the building before and after
- Quote and grant study for the junta

Step by step
From the inspection to the junta and on to the work
Five steps, with a site manager who keeps the president and the property manager informed.
Book a free inspectionFree inspection
We inspect the facade and, if you already have the IEE, its findings. We tell you which work is compulsory and which is an improvement.
Quote and grants for the junta
Itemised quote, derrama (special levy) per flat, calculated savings and the grants you can apply for, in one document for the meeting notice.
The junta's decision
If it helps, we present it at the junta and answer the owners' questions.
Licence and scaffolding
In Palma, repairs or painting with scaffolding go through a comunicación previa, and work can start after 15 days. If the insulation needs a full design, we apply for the licence.
Work, documentation and guarantee
Work with weekly updates, then an energy certificate, a favourable IEE final report for the Ajuntament and a 5-year guarantee in writing.
What we guarantee
What the junta needs to decide
The president, the property manager and every owner want to know the same things: what is compulsory, how much each person pays and whether the insulation is worth it.
A quote you can compare
Items with measurements in m² and unit prices, so the property manager can put it side by side with other quotes. The community pays nothing before signing, 10% at most when work starts and the rest by finished stages that you check with us.
The levy, worked out per flat
We give you the split by share of ownership (cuota de participación) and a payment schedule. If the community takes out a loan, we prepare the project documents for the bank.
Insulation without condensation
Before insulating, we calculate the condensation risk and check how the flats are ventilated, so the damp doesn't end up indoors.
Savings proven in writing
We produce the building's energy certificate before and after: that is what the 60% IRPF (Spanish income tax) deduction requires.
Safe scaffolding, up only as long as needed
A schedule by facade and floor, netted scaffolding, access locked outside working hours and public liability insurance for the whole project.
One point of contact for the community
One site manager updates the president and the property manager every week and looks after the residents during the work.
Good to know
IEE, levy and grants: what the rules say
In Palma, every building aged 50 or more must undergo the Informe de Evaluación del Edificio (IEE, building inspection report) and repeat it every 10 years: in 2026 it is the turn of buildings completed in 1976 and, for the second time, those from 1966. In 2024 only 1 in 5 of the buildings required to submit it did so.
Unfavourable IEE
The work the report calls for is compulsory. You have six months at most to apply for the licence or file the comunicación previa; if this is not shown, the Ajuntament can impose coercive fines of €1,000, €2,000 and €3,000.
Who decides and how it is paid
Compulsory maintenance work doesn't need a vote: the junta only decides how the levy is split and when it is paid. Energy improvements are approved by simple majority if the annual charge, after grants and the loan, does not exceed twelve monthly community fees, and they are then binding on everyone.
Owners who don't pay
The flat itself is liable for the levy, and the community can claim the debt through a special summary payment procedure, with a precautionary seizure if the debtor objects.
Grants in October 2026
The Next Generation grants for building refurbishment are closed in the Balearics. The 60% IRPF deduction remains for each owner who pays tax in Spain as a resident, for work until 31/12/2027 that cuts non-renewable primary energy consumption by at least 30% or brings the building up to an A or B rating (maximum base €5,000 a year and €15,000 in total).
Sources: Palma IEE ordinance (arts. 4, 7, 13 and 15 and timetable); Ajuntament de Palma comunicación previa form (10/06/2024); Economía de Mallorca, 11/07/2025, Ajuntament figures for 2024; Ley de Propiedad Horizontal (Spanish law on communities of owners, arts. 9, 10, 17.2 and 21); Ley 35/2006 del IRPF, additional provision 50; ESEFICIENCIA, 23/06/2026. Updated: October 2026.
Questions and answers
Frequently asked questions about facade renovation in Mallorca
Can't find your question? Message us on WhatsApp and we will answer in Spanish, German or English.
How much does it cost to renovate a building's facade? What does SATE cost per m²?
Our IEE came back unfavourable: are we obliged to repair the facade, and by when?
What grants are there in the Balearics for renovating and insulating the facade?
How is the facade levy split, and can it be paid in instalments?
SATE or a ventilated facade? What problems can SATE cause?
How long does the work take, and how long will the scaffolding be up?
If a piece of facade falls off, who is liable and does insurance cover it?
How much will our electricity and air conditioning bills drop if we insulate the facade?
Book a free facade inspection
We call you within 24 hours on working days. If you already have the IEE, send it to info@greenox-group.es or on WhatsApp and tell us the date of the next junta: we prepare the quote and the grant study so they arrive in time.
Your contact in Palma
Dr. Lennart Jünemann
PhD in energy economics · your contact for all topics