Architects in Mallorca, from design to build
New homes, renovations that need a licence, extensions, pools and legalisations in Palma and across the island. We design with the building budget in view.
- 4.8137 reviews on Google
- 100% recommendation on ProvenExpert (189 reviews)
- Office in Palma de Mallorca
Why Greenox
We get back to you within 24 working hours. No obligation, and you pay nothing before signing.
Dr. Lennart Jünemann · Coordinates your project with our architects · Spanish, German and English
Architect in Mallorca
What our architects in Mallorca do
You need an architect in Mallorca for a new house, an extension or changes to the structure, façade or use. In Palma, any full home renovation also needs a licencia urbanística (building licence) with a project, which for an interior renovation can also be signed by a technical architect. A partial renovation that leaves the structure alone can go through comunicación previa (prior notice). At the first consultation we tell you the route, timescale and cost.
Our architects draw up the project, apply for the licence and follow the work through to the end, in the same team that builds it. So the design takes shape with the building cost in view, and nobody leaves you on your own halfway. If you are renovating your home, we do it as part of our full renovations in Mallorca; if you are building or extending, with our builders in Mallorca.
- Feasibility study: what can be done on your plot
- Preliminary design with an estimate of the building cost
- Basic design and detailed construction project for the licence
- Full renovations with a licence in Palma and across the island
- Extensions, pools, terraces and layout changes
- Legalising works and houses on rustic land (suelo rústico)
- Site management with our aparejador (technical architect) to handover
- Homes that use less: heat pump and solar from the design stage

Free first consultation
At your home, at our office in Palma or by video call. You tell us what you want and we look up the cadastral reference.
Feasibility, timescale and fees
We tell you in writing what the planning rules allow, which licence you need, how long it usually takes and what the fees are.
Preliminary design with figures
Layout, volumes and an estimate of the building cost before the full project is drawn.
Project and licence
We draw up the basic design and the detailed construction project, submit them and respond to the council's requests.
Site management and completion
Our architect directs the works with the aparejador and signs the final certificate, and we apply for the first-occupation licence.
What we guarantee
Why a Greenox architect
People who commission a project usually fear three things: that the build ends up far more expensive than planned, that the licence drags on without anyone saying so, and that the professional disappears once work starts. We work to make sure none of that happens to you.
Design with the price in view
The people who build it work out the cost from the preliminary design. So you don't fall in love with a project you then can't afford.
Clear timescales from the start
We tell you which licence you need and how long it usually takes in your municipality, with the timetable in writing, and keep you informed at every step of the application.
The same team until handover
Project, licence, site management and construction in the same team, with a 5-year written guarantee on the building work. Nobody walks off your project after an argument with the builder.
Fixed fees
A fixed price in writing for the project and site management, with the aparejador included. For reference, the market charges 3% to 12% of the build cost.
Homes that use less energy
Insulation, orientation, heat pump and solar panels are decided in the design, not once the house is already built.
Spanish, German and English
Meetings by video call and every document explained in your language if you live outside Mallorca.
Good to know
Licences and timescales in Mallorca: what you need to know
What delays a project most isn't the drawing, it's the licence. That's why, before you sign, we tell you which route applies and what timescale to expect. If your work doesn't need a licence but a comunicación previa with a technician, we explain it on our aparejador and site management page.
How long the licence takes
In Palma, the legal deadline is 3 months, with positive administrative silence (no reply counts as approval), but in practice the standard route took 9 to 12 months in early 2026. Since December 2025, thanks to the declaración responsable (signed declaration), work starts a few days after the licence is granted. Before you sign, we give you the expected timetable for your municipality in writing.
Full renovation in Palma
It needs a licencia urbanística with a project: the comunicación previa forms exclude it. A partial renovation that doesn't touch the structure and redistributes less than 60% of the usable floor area goes through comunicación previa.
Legalisation on rustic land
On 15 February 2025, the Consell de Mallorca (island council) opened a three-year extraordinary procedure to legalise existing buildings, structures and installations on rustic land. The deadline ends in February 2028.
Who signs what
For a new home, an architect signs the project and the site management, and a technical architect or aparejador signs the supervision of the construction work. If a renovation doesn't substantially change the structure, façade, volume or use, a technical architect can also sign the project. On our projects, they work together.
Sources (in Spanish): Ajuntament de Palma (Palma city council), licencia urbanística (Obras.02) and comunicación previa form 2 (10/06/2024); Ara Balears (01/10/2026), real duration of the standard route in Palma; Consell de Mallorca, resolution of 13/02/2025 (BOIB, the Balearic official gazette, no. 21, 15/02/2025), under the seventh additional provision of Ley 7/2024; Ley 38/1999 de Ordenación de la Edificación (Building Act), arts. 10, 12 and 13. Fees: Cronoshare, architect's fees (03/01/2026); planning fee and ICIO (construction tax) in Palma: Ajuntament de Palma, Obras.01 (09/01/2026). Updated: October 2026.
Questions and answers
Frequently asked questions about architects in Mallorca
Can't find your question? Message us on WhatsApp and we will answer in Spanish, German or English.
More services for your project
Aparejador and site managementBuilders in MallorcaVilla and finca renovationsHow much does an architect charge for a renovation project or a house?
Do you need an architect to renovate a house?
How long does a building licence take in Palma de Mallorca?
What are the proyecto básico and the proyecto de ejecución?
Architect or aparejador: who does what?
Can work done without a licence, or a house on rustic land, be legalised?
Can I extend my house or build a pool in Mallorca?
Can we hold the first consultation by video call, in German or English?
Book your first consultation with our architects
We call you within 24 hours on working days to arrange it, in Palma, at your home or by video call. It is free and there is no obligation.
Your contact in Palma
Dr. Lennart Jünemann
Coordinates your project with our architects · Spanish, German and English